
 
 
 
 
 
 
 
 
 
 
 
 
 
Contents:
The service was withdrawn in
1936
 
Huddersfield also ran trams to West Vale.
Halifax trams had a gauge of 3 ft 6 inches.
Huddersfield trams had a gauge of 4 ft 7¾ inches.
Bradford trams had a gauge of 4 ft 0 inches.
The different track widths prevented the Halifax services linking
with those of Huddersfield.
 
Extensions were proposed, but not completed, for
 
See
Tram Number 122
 
On
5th August 1899,
the route was extended to Pellon via Pellon Lane.
 
The service eventually ran from Highroad Well to West Vale.
 
Huddersfield also ran trams to West Vale.
Halifax trams had a gauge of 3 ft 6 inches.
Huddersfield trams had a gauge of 4 ft 7¾ inches.
Bradford trams had a gauge of 4 ft 0 inches.
The different track widths prevented the Halifax services linking
with those of Huddersfield
 
Trams came down Bonegate into Brighouse, turning right at St James's Church then on to the Brighouse Terminus, just short of the
George corner.
Trams to Bailiff Bridge, went back to St James's Church where
the points at the junction were changed, and the vehicle proceeded to
Thornhill Briggs and Bailiff Bridge.
 
Several extensions were proposed, but not completed
 
This & associated entries use material contributed by David Nortcliffe 
The tram service to Sowerby Bridge was withdrawn in
1934
 
The tram service to Sowerby Bridge was withdrawn in
1934
 
An extension was proposed, but not completed, for a route from
Dudwell Lane, along the Calder valley, to Pye Nest
 
The route was closed on
18th January 1938
 
See Route Number 10
Route Number 1 Ref 21-R1 
Route Number 2 Ref 21-R2 Route Number 3 Ref 21-R3 
Route Number 4 Ref 21-R4 Route Number 5 Ref 21-R5 
Route Number 6 Ref 21-R6 Route Number 7 Ref 21-R7 
Route Number 8 Ref 21-R8 
Route Number 9 Ref 21-R9 Route Number 10 Ref 21-R10 
Route Number 11 Ref 21-R11 Route Number 12 Ref 21-R12 
Page Ref: MMR1400
| 
 | ||
| site search by freefind |